NOQ Report
  • About Us
    • Contact JD Rucker
  • Type
    • Aggregated
    • Curated
    • Original
  • Style
    • Opinions
    • News
    • Videos
  • The JD Rucker Show
    • Apple Podcasts
    • Bitchute
    • Brighteon
    • FrankSpeech
    • X
No Result
View All Result
  • About Us
    • Contact JD Rucker
  • Type
    • Aggregated
    • Curated
    • Original
  • Style
    • Opinions
    • News
    • Videos
  • The JD Rucker Show
    • Apple Podcasts
    • Bitchute
    • Brighteon
    • FrankSpeech
    • X
No Result
View All Result
NOQ Report
No Result
View All Result
Boeing Under Fire After Report Found That Employees Were Told to Prioritize Speed Over Quality

Boeing Under Fire After Report Found That Employees Were Told to Prioritize Speed Over Quality

by Townhall
September 27, 2024
in Aggregated, News

  • Former White House Advisor: “Trump to Release $150 Trillion Endowment”


A special investigation spearheaded by the Federal Aviation Administration (FAA) found that Boeing prioritized production speed over quality and failed to train its employees accurately.

According to the “troubling” findings of the FAA’s 2024 special audit— published on Wednesday— Boeing allegedly took “shortcuts” on production and failed to provide its mechanics with the appropriate tools and resources to complete their work.

MPS Free Food

The memo, released by the U.S. Senate Permanent Subcommittee On Investigations (PSI), said, “Boeing personnel continue to feel pressure to prioritize speed of production over quality.”

More from the memo:

In a May 2024 employee survey, the company found: Only 47% percent of respondents answered favorably to the statement, ‘Schedule pressures do not cause my team to lower our standards.’

Boeing continues to fail to ensure that nonconforming parts are appropriately documented, stored, and dispositioned so that they are not installed on aircraft. The FAA’s special audit found an absence of process control for scrap articles that left the secure Material Review Segregation Area until rendered unusable’ in two areas used to store nonconforming parts. [There are instances where Boeing’s quality inspections were not always performed by] qualified and independent personnel. [Boeing employees were allowed to] inspect the quality of their own work. […]

— Read More: townhall.com

Jase Medical


  • Gold SKYROCKETED during Trump’s first term and is poised to do it again. Find out how Genesis Precious Metals can help you secure your retirement with a proper self-directed IRA backed by physical precious metals.


Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© 2024 Discern Media Network. Privacy Policy

No Result
View All Result
  • About Us
    • Contact JD Rucker
  • Type
    • Aggregated
    • Curated
    • Original
  • Style
    • Opinions
    • News
    • Videos
  • The JD Rucker Show
    • Apple Podcasts
    • Bitchute
    • Brighteon
    • FrankSpeech
    • X

© 2024 Discern Media Network. Privacy Policy